一级大片儿I亚洲第一页在线I在线观看黄avI欧美一区二区三区免费看I男女互插视频I不卡的中文字幕I香蕉视频黄污I亚洲va久久久噜噜噜久久I亚洲欧美日韩综合I久久小草I91最新入口I黑人黄色录像I免看一级a毛片一片成人不卡I天天综合天天添夜夜添狠狠添I亚洲欧美另类小说I色小姐avI日韩女女同性aa女同I亚洲成人久I日韩永久免费I国产高清视频在线观看I偷啪自啪I黑人超碰Iav最新资源Iav五月天在线I欧美日韩激情视频

Welcome to Hashimoto Precision Metal (Shenzhen) Ltd

Mailbox:

info@hskcoltd.com

Hashimoto Precision Metal (Shenzhen) Ltd

Specialize in precision stamping parts since 1935
News
Your position: Home > News > Industry news > Preparation work before precision metal stamping

Contact us

Hashimoto Precision Metal (Shenzhen) Ltd

Address: No. 25, Xinfa East Road, Xiangshan Community, Xinqiao street, Bao'an District, Shenzhen 518125, P.R.China

Tel: +86-755-27267875

Email: info@hskcoltd.com

Industry news

Preparation work before precision metal stamping
Release time:2024-01-29Views:2131


In the production process of precision metal stamping, the preparatory work in the early stage is the key to ensuring product quality and production efficiency. Adequate preparation can not only reduce production costs, but also ensure the smooth progress of the production process. The following are several important preparations that need to be done before stamping.


Firstly, the design phase is the foundation before precision metal stamping. Engineers need to use computer-aided design (CAD) software to draw precise drawings of products and make corresponding molds based on these drawings. The design of the mold should take into account metal flow, punching pressure distribution, and material rebound characteristics to achieve accurate control of part size and shape.


Next, after the mold manufacturing is completed, a trial mold needs to be conducted. This process can identify potential design defects or manufacturing errors, such as burr generation, crack propagation, and other issues. Only after passing the trial mold can the mold be put into mass production.


In addition, material selection is also crucial. Select appropriate metal materials according to product requirements and ensure that the flatness, hardness, and composition of the materials meet the requirements of precision stamping. If necessary, pre-treatment of materials such as cleaning, degreasing, straightening, etc. is also necessary to ensure their quality stability during the stamping process.


In terms of stamping equipment, it is necessary to check whether the performance of the press meets the processing requirements, including its tonnage, stroke, speed and other parameters. At the same time, it is also necessary to ensure that all parts of the press, such as the slider, guide rail, safety device, etc., are in good condition.


The technical level and experience of operators are also important factors affecting the quality of precision metal stamping. Therefore, providing professional training to operators to familiarize them with equipment operating procedures and product quality standards is an indispensable preparatory step.


In summary, the preparation work before precision metal stamping involves multiple stages such as mold design and manufacturing, material selection and pretreatment, equipment inspection and maintenance, and personnel training. These tasks are interrelated and together form the cornerstone of high-quality stamping products. Only meticulous and thoughtful preparation can ensure the smooth progress of precision metal stamping technology, thereby producing products that meet expectations.


Inquire Now * required
Submit
主站蜘蛛池模板: 乐亭县| 博乐市| 赣州市| 阜新| 务川| 开江县| 河曲县| 台山市| 家居| 集安市| 汨罗市| 涟源市| 阿克苏市| 项城市| 潍坊市| 霍山县| 沂源县| 新化县| 浙江省| 福泉市| 灵川县| 峡江县| 璧山县| 仙游县| 牟定县| 合川市| 屏东市| 京山县| 搜索| 渑池县| 静宁县| 邵武市| 镇巴县| 苏州市| 桂阳县| 栖霞市| 克山县| 双城市| 句容市| 鄂温| 临高县|