一级大片儿I亚洲第一页在线I在线观看黄avI欧美一区二区三区免费看I男女互插视频I不卡的中文字幕I香蕉视频黄污I亚洲va久久久噜噜噜久久I亚洲欧美日韩综合I久久小草I91最新入口I黑人黄色录像I免看一级a毛片一片成人不卡I天天综合天天添夜夜添狠狠添I亚洲欧美另类小说I色小姐avI日韩女女同性aa女同I亚洲成人久I日韩永久免费I国产高清视频在线观看I偷啪自啪I黑人超碰Iav最新资源Iav五月天在线I欧美日韩激情视频

Welcome to Hashimoto Precision Metal (Shenzhen) Ltd

Mailbox:

info@hskcoltd.com

Hashimoto Precision Metal (Shenzhen) Ltd

Specialize in precision stamping parts since 1935
News
Your position: Home > News > Industry news > Why choose stamping

Contact us

Hashimoto Precision Metal (Shenzhen) Ltd

Address: No. 25, Xinfa East Road, Xiangshan Community, Xinqiao street, Bao'an District, Shenzhen 518125, P.R.China

Tel: +86-755-27267875

Email: info@hskcoltd.com

Industry news

Why choose stamping
Release time:2022-07-11Views:2771


There are various ways of metal processing. If the volume is large and the accuracy requirement is relatively high, stamping will be selected. Stamping products are stable in dimension, light in weight, and have good surface condition and accuracy. As they depend on punches and molds, the production cycle is long and initial mold investment is large. There are three common types of stamping dies:

1)Single punching die: in one stroke of stamping, only one process can be completed, generally manual feeding

2)Continuous die: it is also translated as "progressive die". Two or more stamping processes are completed at the same time during one stroke of stamping

3)Composite mold: multiple materials are carried out simultaneously or multiple processes are conducted at the same time.


When the quantity of mass production is not large or the product has not been finalized, the early trial will be completed by prototype or single die, which can be at a lower cost. When the shape and specific dimensions of the product have been verified and can be batched, continuous die or composite die will be used. Because there will be a gap between theory and practice, the yield of raw materials and the matching degree of mold parts are not equal to the actual value. "Prank" action in the early mold trial stage is to find out the differences between the design and practice, repair or remake parts, in order to make the quality of the products completely consistent with the requirements of the drawings.


This cycle is determined according to the difficulty of the product. It can be done quickly at one time, whereas sometimes the mold in the R & D stage will take half a month or even more. This process is like the process of cocoon stripping, which is also like go see a doctor. In the eyes of the mold repairman, every steel plate has life. Under the skillful hands of punching, rubbing, grinding and knocking, each part can achieve the best clearance. By cooperating with each other, a satisfactory finished product can finally be produced.

Inquire Now * required
Submit
主站蜘蛛池模板: 屏东县| 澄迈县| 任丘市| 峡江县| 长子县| 贵定县| 昆明市| 金乡县| 台南县| 满城县| 潞城市| 闸北区| 马公市| 石泉县| 扬州市| 米林县| 封开县| 西丰县| 米脂县| 南昌县| 平果县| 波密县| 连南| 库伦旗| 芦溪县| 乐陵市| 福清市| 慈利县| 安阳市| 文登市| 黔东| 甘泉县| 新昌县| 洱源县| 龙游县| 祁东县| 临猗县| 长治市| 富宁县| 龙州县| 繁峙县|